Hi All,
We are planning to have the RA deriving the POC% from the Progress analysis and which we will maintain in Level 1 WBS. In the back end we have done the settings and also as detailed in the blog Results Analysis Method 7, POC Method Based On Pr... - SAP Community
The following settings are done:
Valuation Method for RA Key with the status is configured in OKG3 with progress version 100 and other settings as below:
VC maintenance as below
Assignment of CE to VC
Question : These cost elements are not existing and was copied from client 000. I hope we should assign an existing one.
SKF 30 defined for POC with usage 3
SKF is assigned to the VC.
However when I run KKA2 I am not getting the POC% which is maintained in the Progress Tab. I am new with this set up but is the POC% taken from the project builder as a part of the standard or is it taken from Progress Analysis after we run CNE1.
Regards,
Suman Misra