During goods receipt

0 Kudos

At the time migo I got error like, no material number record found. What I need to do now

VigneshV
Participant
0 Kudos

Hi

Would be helpful if you are sharing some screen shot on the error faced os error message number.

Vignesh V

0 Kudos

this is the error during goods receipt

Accepted Solutions (0)

Answers (2)

Answers (2)

RAHEEL_BABAR
Active Contributor

Hi,

Share proper error, or first you need to create material by using MM01.

BijayKumarBarik
Active Contributor
0 Kudos

You are doing goods receipt with respect to which document?

As error mentioned- you need to make sure material code created in your system for your plant/s

0 Kudos

I am doing GR with reference to Shedulling agreement (PO)