cancel
Showing results for 
Search instead for 
Did you mean: 

UD time with Code Valuation Blank Not Evaluated

fidy
Participant
0 Kudos

Hi,

I am wondering if it is possible to have Usage Decision Time (QALS-VDATUM / QALS-VEZEITERF) when we have blank in UD Code (QAVE-BEWERTUNG)

This is the opposite case what snote 2634078 indicates.

JoshuaBatson
Participant
0 Kudos

Hello,

I don't understand what you are asking. Are you suggesting that this has happened to you ? In which case I would advise that you raise a ticket with SAP. Or are you asking can you some how populate the Usage Decision Time without actually making a Usage Decision ? In which Case I would ask for more information about the business requirement you are trying to meet.

Regards

Josh

fidy
Participant
0 Kudos

Hi, thanks. I just think of the possibility if it is possible or not. I have been thinking about the timestamps around inspections and I want to clarify that being blank in both UD code and UsgDec. Time only designates the situation which inspection hasn't started.

Accepted Solutions (0)

Answers (0)