on 07-08-2023 4:24 PM
Hi experts,
I have a task to replace the work center id in all places it is used.
So, basically, all tables where it is used.
I will have a report which will load an Excel file with mappings, and old/new work center id.
What is the best/fastest way to do it, or should I go through every table manually in the report and create a new then delete an old entry?
Kind regards.
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.