cancel
Showing results for 
Search instead for 
Did you mean: 

Manual Fulfilment in RAR Custom report

vijaymanikandan
Contributor
0 Kudos

Hi,

I am looking to build a report for manual fulfillment. I know that SAP has given the Manual fulfillment FPM application but we want to kind of make this work like RA to RAR integration when there is an action happening in the system which is not creating RAI we want to run a report to check certain criteria and directly fulfill the POB in the same way like the Manual fulfilment FPM application.

I understand that the below class methods are involved in the standard FPM application.

Method - MANUAL_FULFILL_POBS in class CL_FARR_POB_TREE_MANFUL_FEEDER

Method MANUAL_FULFILL_POB in class CL_FARR_MANUAL_CONTRACT_MGMT

Need your views if this can be done in a safe way.

Br,

Vijay V

Accepted Solutions (0)

Answers (0)