SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

How to identify prorration period at rate step level

0 Kudos

Hello to all,
I'm in a atypical situation, according to requirement when consuption cover a normal period I have to do calculation on monthly period basis but if I'm on a prorrated period like price changing or device replacement I have to do billing based on day period basis.
I've try using IF11, IF16 and IF17 variants but none of them do what I need.
Does anybody knows if this is posible?
Thanks in advance.

0 REPLIES 0