Hello,
As I was working on validating system for b2105 upgrade, I discovered a very strange issue. I have a Program that is duration based with 29 days. I assigned it to a user on 10/22/2021 and the end date shows up as 11/19/2021 which is 28 days so it is off by 1 day. The expected end date should have been 11/20/2021. What's odd is when I assign it with assignment date in August or September it calculates the correct end date i.e. assigned on 8/22/2021, end date shows correctly as 9/20/2021. Has anyone noticed this? I've already checked and we have no holiday or calendar specified. We only have M-F work hours defined. In addition, we created a program 15 days and assigned it on 10/22/2021 and end date shows 11/5/2021 which is correct.
Thanks,
May