Dear all
I face a problem.
The options under MM12 in the APP Fiori are not available.
When I want to paste a list of material to implemented the date change in MM12 under Fiori app, I don't have the option. The sytem only let me to paste material one by one.
Is there an action to do to have the same behaviour as on the MM12? Do we have an app that permite to schedule the change in the material master in mass mode?
Thank you
Ingrid
Hi,
MM12 is also used for single material change.
have you try this fiori app?
Mass Maintenance for Master Data
Regards