on 07-11-2016 4:37 PM
HI!
After upgrade of NWBC 6.0 to PL5 and SAP GUI 7.40 to PL9 I'm facing an issue: I can't connect using an NWBC system selector to an SAP ABAP application server which is configured using SAProuter string. I get an error "partner **** not reached". Whereas using system selector of SAP GUI itself (SAP Logon) I can connect to the same system without any troubles. Prior to update everything worked. Please tell me this is a known bug? If not, please advice how to solve/trace an issue.
Thanks in advance!
if you look in BC System Selector. do you see the connected Router in the relevant field?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
74 | |
9 | |
8 | |
7 | |
6 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.