Hello All,

I have a DTP which loads data from DSO to DSO based on Valid customers in a particular week.
There are say 100 unique customers, then I want the number of data packets to be 100.

I used semantic grouping on this customer field, and set my datapacket size to 2k , but still there are chances that 2 unique customers come in single data package - in case Cuctomer 1 = C1 =500 records and Customer 2 = C2 = 1500 records.

Please let me know using what settings I can make sure that a data packet has single customer records (as said in above case semantic key may not always work)

I see Optimal datapacket size set in DTP take preceedence ove semantic key sometimes.

Please suggest any option/settings I can use for this.

Thanks
Sonal

View Entire Topic
former_member185132
Active Contributor
0 Kudos

If you set semantic grouping on Customer ID and set the packet size to 1 record, then the system will give you only one customer ID per data packet.

I am curious though, as to why you would need to do this. What business requirement do you have that necessitates such a solution?

0 Kudos

Hi Suhas,


Yes it works with packet size 1. Thank you


We have logic based on customer... It is like for a valid customer if we have data recieved for any combination of materials irrespective of validity we need to see the calculation for all combination of that customer.

If a customer is in single data package then as per the logic this will work completely. If it is split in to two or ore then we will miss that all combinations getting updated to the target.

As there may be chances that for the 1st data packet there 10 combinations of material for a customer C1 and out of all the 10 we have not recieved data for any of these.
In data packet 2 we get same customer C1 with 5 other materials and we have data for one of the material then it will update these 5 customer * materials only...  the customers*materials that are proesent in datapacket 1 will get missed.

We have option for coding to fix this but since it is calculations based on calday , I was looking for a solution directly in P till we get the new code changes to P.

Thanks