Hi All,
We are having requirement to upgrade our SAP BW systems to SAP BW4HANA.
We have 2 BW systems, 1 is SAP BW 7.3 connected with ECC and another is SAP BW 7.5 connected with S4.
Requirement is to consolidate the systems and upgrade to BW4H...
Day 1 - https://blogs.sap.com/2021/11/17/teched-2021-sap-analytics-track-q-a-summary-sap-dwc-sac-bw4hana-day-1/#
This blog covers Q/A summary for some of the sessions delivered during SAP TechEd 2021 for analytics track on day 2.
Date – 18th Nov. 2...
This blog covers Q/A summary for some of the sessions delivered during SAP TechEd 2021 for analytics track on day 1.
Day 2 - https://blogs.sap.com/2021/11/18/teched-2021-sap-analytics-track-q-a-summary-sap-dwc-sac-bw4hana-day-2/
Date – 17th Nov. 20...
Curated Questions posted by attendees during the SAP TechEd 2020 sessions and answered by presenters in analytics track.
Please refer following blog for Day 1 Q/A.
TechEd-2020 SAP Analytics Q/A Summary (SAP DWC, SAC, BW4HANA) – Day 1
Date – 10th D...
Curated Questions posted by attendees during the SAP TechEd 2020 sessions and answered by presenters in analytics track.
Please refer following blog for Day 2 Q/A.
TechEd-2020 SAP Analytics Q/A Summary (SAP DWC, SAC, BW4HANA) – Day 2
Date - 09th D...
Please check if these blogs works for you,How to Assign an UNSPSC Code into Material Master in SAP without using any EnhancementUNSPSC in Material Master
Hi Roma,As per blogging guideline it will be approved in 4-5 business days but generally it gets approved earlier by global moderators.Please refer this guidelines for more details,BloggingThanks,Bhavin