on 05-01-2024 10:10 AM
Hi,
I want to control and assign multiple output types automatically when PO is created,
and those output types should be assgined to one PO.
I assume configuration "Maintain message determination schema" and its step(STUNR), counter(ZAEHK), requirement(KOEBD) can be the solution, but I'm not sure how those fileds work.
Could you please teach me how I can control mutiple assignment of output types?
User | Count |
---|---|
88 | |
9 | |
7 | |
5 | |
4 | |
3 | |
2 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.