3 weeks ago
When doing a Plant Maintenance Work Order confirmation and recording Failed Notifications against more than one Measuring Point on the Technical Object, Only one Notification (type M9) is raised for the Confirmation with the description matching the Text entered for the last failed measuring point. Our business wants one (for better or worse) per failed Measuring point.
i.e. 3 Fails => 3 notifications.
Is this possible and if so how?
Regards
Seamus Norris
Hi,
This looks like a custom enhancement, check with your Technical team
Regards
Terence