Hi,
I have a situation where i bring the material and doesn't own it. I treat it as non valuated material with quantity update. Now i do some repair works on it and want to capture the cost and charge it back to the one from whom i have brought the material. Repair works will involve both material procurement(parts) and services. I need to be able to capture these costs and add material value with margin and have it ready for sale to customer.
How best this can be mapped?
This requirement can be met with the Customer Service functionality but it won't work if the material is non-valuated.