on 10-20-2020 10:33 AM
I have maintained "All components" check box active in OKP4 (Confirmation Parameters) for component consumption.
when I do Confirmation in CO15 the components are getting issued.
But on doing confirmation in COHV the components are not getting issued to production order.
Is this is system behaviour or any configuration missing.
Also I dont want to use back flush indicator in Material, Routing or Workcenter.
Hey Raghavan,
I hope you're well and safe.
Please check the link below and see if it helps on your demand.
https://answers.sap.com/questions/9755504/goods-movements-in-cohv.html
Cheers.