on 05-07-2020 6:21 AM
Hello Experts,
I installed Eclipse (2020-03) and added ADT on it, I created a project for the older SAP ERP Dev system without any problem, but when creating a project for my S4HANA system it stops on the stage: Retrieving compatibility information from backend system.
After activating Trace on Eclipse and comparing the two connection Logs,
I suspect this error:
[ERROR] Initialization of repository destination adt.tmp_1588827698049 failed: Connect to SAP gateway failed
Connection parameters: TYPE=A DESTINATION=adt.tmp_1588827698049 ASHOST=XXX.XXX.XXX.XXX SYSNR=00 PCS=1
LOCATION CPIC (TCP/IP) on local host with Unicode
ERROR partner XXX.XXX.XXX.XXX:3300 not reached
TIME Thu May 07 07:02:29 2020
RELEASE 753
COMPONENT NI (network interface)
VERSION 40
RC -10
MODULE D:/depot/bas/753_REL/src/base/ni/nixxi.cpp
LINE 3449
DETAIL NiPConnect2: XXX.XXX.XXX.XXX:3300
SYSTEM CALL connect
ERRNO 10060
ERRNO TEXT WSAETIMEDOUT: Connection timed out
COUNTER 3
Could you give me some help on that ?
Thanks in advance,
My best regards.
Thank you frdric.girod
Effectively, this issue was solved by the network team,
My best regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
96 | |
7 | |
6 | |
6 | |
3 | |
3 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.