Supply Chain Management Blogs by SAP
Expand your SAP SCM knowledge and stay informed about supply chain management technology and solutions with blog posts by SAP. Follow and stay connected.
cancel
Showing results for 
Search instead for 
Did you mean: 
rupali_ray
Employee
Employee
This blog is a continuation on creating various assessment in ASPM application.

First blog provides details on the application and master data creation required for the risk and criticality assessment. Let's start with understanding what is risk and criticality assessment and how it can be achieved in ASPM.


Risk & Criticality Assessment, in its simplest form, is defined as “the effect of uncertainty on objectives”. The risk assessment process starts by first identifying risk events. In turn, these risk events have two main dimensions:

  • The consequence of an event / severity of the untoward outcome

  • The likelihood of an event / how often such uncertain event could happen


Risk & criticality assessment helps in quantifying the probability of undesirable event and consequence of such event. It further helps in classifying these risks in various performance measures like safety, environment, operational loss, impact on companies’ brand etc.

Key Elements to perform a Risk and Criticality Assessment:

  • Impacts – This is the business goal for which you want to identify the risk score and criticality value. For example, if the dewatering pump is not working properly, it might not affect the production of the site, however it might affect the safety and human life. Hence based on the business goal, an asset can have different criticality values.

  • Scale - This defines the answer options which the user will get once linked with the question.

  • Dimension – This defines the dimension on which the risk and criticality will be done. It also contains the question which the reliability engineer will answer during the risk and criticality assessment. For example, you can do risk and criticality on “Probability of Failure” and “Consequence of Failure”. Also, you can add one more dimension to it “Severity of Failure”

  • Assessment Template - This defines which all parameters will be included in the risk and criticality assessment. This is defined by the company admin using Impacts/ Scale/Dimension.


Example:

In my pervious blog, I have already created two equipment namely “Dewatering Pump” & “Fire Fighting Pump”.

In this blog, I will be doing risk and criticality assessment on both the equipment.

Since the usage of both the equipment is different, I will be doing two separate risk and criticality assessment. Risk and criticality assessment can be done together for similar set of equipment or different kind of asset. Based on the result of the assessment, the next steps will be triggered. The functionality is based on 2002, with future releases further enhancement can be available.

1.1    Create Impacts/Sections



  1. From the FLP, click on the “Assessment Templates” tile. Once routed to the Assessment Templates page you will need to additionally route to the Impacts/Sections card.




  1. At this point, you create a new impact/section by clicking ‘new’ and providing a description and category.

  2. Click Publish, so that it can be consumed while creating the assessment template.


In my example I want to understand the risk and criticality value for “Safety” and “Environment” category. Hence I have created two impacts as the below:


1.2    Create Scales/Answers



  1. From the FLP, click on the “Assessment Templates” tile. Once routed to the Assessment Templates page you will need to additionally route to the Scales/Answers card.




  1. At this point, you can either create a new scale/answer by clicking ‘new’ and providing a description and scale options. Only alpha-numeric type will be allowed in alphanumeric assessment template. With this setting, the heat map will show display values instead scale values.




  1. Click Manage->Publish. Only published scale can be consumed in “Dimension”.


In my example, I have created three scale object which will be associated with three different dimensions.






1.3    Create Dimensions/Questions



  1. From the Operator FLP, click on the “Assessment Templates” tile. Once routed to the Assessment Templates page you will need to additionally route to the Dimensions/Questions card.




  1. At this point, you can create a new dimension/question by clicking ‘new’ and providing a description, question and scale created earlier. Note, each question needs to relate to an answer. You can create the scale/answer from the dimension/question page also by clicking on ‘new’ to be redirected to the question / answer creation page.




  1. Click Manage->Publish.


I have created three dimension which I will be using in the assessment template creation:








1.4    Create a Risk and Criticality Template



  1. From the Operator FLP, click on the “Assessment Templates” tile. Once routed to the assessment template page, click on ‘Risk and Criticality’ card. After being routed to the Risk and Criticality view, please click new and fill in the details. Different calculation options are provided for the admin, based on the company requirements, admin can select the best calculation method required. If alphanumeric is marked as true in the assessment template, the dimension associated with alphanumeric scale type is only allowed. With this setting, the heat map will show display values instead scale values. Details on calculation method are available at SAP Help Portal.




  1. In Information Section, you can select roles as ‘Mandatory’ or ‘Optional’. The roles selected here will be available during assessment.

  2. In Assignment section, you can assign equipment templates, location templates, model templates, system templates, class, subclass. Using this information, pending assessment details for the equipment will be identified. Assign both the equipment template using which equipment were created. With this assignment, admin ensures that all equipment derived out of the particular equipment template follows the same RC AT and does atleast once the RC assessment of the equipment.

  3. Assign the both the impacts which was created earlier

  4. Assign set of dimensions based on which risk and criticality will be assessed.

  5. On click of edit, you can change the axis of the dimension and weightage if it is required.

  6. Select the threshold and define the next steps. In my example, for criticality „B-Medium“, The suggested action is to create daily checklist assessment. For criticality value „A-High“ FMEA is suggested.




  1. Publish the assessment template so that you can create assessment using it.


Perform a Risk & Criticality Assessment


As a reliability engineer of the nuclear site, I would like to do risk and criticality assessment of two main equipment:

  1. Fire Fighting Pump

  2. Dewatering Pump


As admin, the corresponding equipment template as assigned to the RC AT, hence any equipment derived out of the ET will be shown as pending assessment by the system if there is no earlier assessment done with the particular RC AT. As a reliability engineer you can trigger the RC assessment from the pending assessment HC in the particular equipment or directly create a RC assessment and assign the equipment to it manually.

Once the RC assessment is published, the same is updated in the asset indicators dedicated for ASPM scores. Below mentioned indicators are updated from RC assessment


Option 1: Creating RC from Pending Assessment HC:

  1. From the FLP, click on ‘Equipment’ tile. Once navigated to the Equipment List view . Search “Dewatering Pump”. Navigate to the equipment object page by clicking the row.

  2. Navigate to ‘Assessment’ section. And select the highlights section. Under the ‘Pending Assessment’ card, system will be proposing one pending assessment for risk and criticality.




  1. Select the ‘risk and criticality’ link in the card, it will show the details on which RC AT the risk and criticality is pending. Select on the RC AT and provide RC assessment details. It will create a RC with the particular RC AT and the equipment assigned.

  2. Navigate ‘Questions and Answer’ section in the newly created assessment object page. Based on the usage of the ‘Dewatering pump’, reliability engineer will answer the questions selected in the respective RC AT. In My example, I have selected the below answers.






  1. On Publish of the RC assessment, the final score is calculated and based on the threshold defined in the RC AT, the colour is determined, and the next steps are shown for the reliability engineer. “Dewatering Pump Equipment template” also contains global indicators (Mentioned in series 1), hence on publish of the RC assessment, the asset indicator are also updated in the equipment object page. Indicator - Risk, Relative Risk, Criticality is updated during risk and criticality assessment. Risk priority number is updated during the FMEA assessment.

  2. Also, the same information is updated in ABC indicator if SAP ERP system is connected to ASPM and the equipment is sync with SAP ERP.


With my example, “Dewatering Pump” is calculated as “A – High” shown in the equipment header and the next steps is mentioned as FMEA assessment. Also, based on FMEA result, further RCM assessment will be triggered. Hence as a reliability engineer, I will trigger the FMEA assessment in my next series.



Option 2: Creating RC Assessment directly:

  1. From the FLP, click on ‘Assessment’ tile. Once navigated to the Assessment view click the ‘Risk and Criticality’ card. Then click new button.




  1. Click information section and roles section, and maintain roles if selected in the assessment template.

  2. Maintain the scope of the risk and criticality.

  3. Click the information header and select the ‘Assignments’ card. Assign equipment “Fire Fighting Pump” by clicking the ‘Assign’ button in the equipment table.






  1. Now find the ‘Questions and Answers’ Header and select it. Provide answers to the questions and ‘Save’. You can toggle between the heat map and text view to assess the risk. Below screenshot shows the heat map view whereas a user you can select the answers from the drop down and view the score in the heat map. User can swap axis also.






  1. On Publish of the RC assessment, the final score is calculated and based on the threshold defined in the RC AT, the colour is determined, and the next steps are shown for the reliability engineer. “Fire Fighting Pump Equipment template” didn’t contain any of the asset indicators (Mentioned in series 1), hence on publish of the RC assessment, no indicators are updated in the equipment object page

  2. Also, the same information is updated in ABC indicator if SAP ERP system is connected to ASPM and the equipment is sync with SAP ERP.

  3. The Risk and Criticality Assessment is now completed, and information is updated in the equipment page




With my example, “Fire Fighting Pump” is calculated as “B – Medium” shown in the equipment header and the next steps is mentioned as daily checklist, hence as a reliability engineer, I will trigger the checklist assessment in my upcoming series.

In my next blog series I will cover FMEA assessment:

Series 1: Brief Overview of ASPM and Master data setup

Series 2: Risk and Criticality (RC)

Series 3: Failure Mode Effect Analysis (FMEA)

Series 4: Checklist Assessment

Series 5: Reliability Centered Maintenance (RCM)

Series 6: Recommendation

Series 7: Preventive Maintenance Review (PMR)

 
Note –  For any abbreviations, please refer the blog series 1
27 Comments
former_member688897
Participant
0 Kudos
Hello

Thanks for the blog with all the information.
One small question around ABC indicator . After the assessment is complete does the abc indicator get updated in the backend s4 equipment asset central tab only or also the original abc indicator field in the equipment master as well?
former_member688897
Participant
0 Kudos
As per point 7,is the normalized risk score calculated based on some weight-age?
former_member688897
Participant
0 Kudos
Another question is on the scales.

Is there a limit on the parameters within the scales used.e.g if we want to use a scale of 1-100 for each impact category. How many entries can be done while creating the scale.
rupali_ray
Employee
Employee
0 Kudos
Yes, the original abc indicator field is updated.
rupali_ray
Employee
Employee
0 Kudos
Risk score is calculated based on the configuration done in the assessment template, which can take weightage at impacts and dimension level. Normalized score is the calculated out of the this risk score.
rupali_ray
Employee
Employee
0 Kudos
Risk and criticality assessment works optimally for 10-15 scale options. Is there any usecase where 100 scale options are required?
former_member688897
Participant
0 Kudos
Thankyou for the answers. No such use case of more than100 scales as of now.

Have another small query as below:

For risk and criticality assessment, we have calculation method for dimension and impact as addition, where in we can use the weight age. We understand the weight age at the dimension level, where we can allocate percentages, but what is the effect of using weight age at the impact level. we don't see any option to manage weight ages at the impact level ?  Is it that when we select weight age at impact level we would get another option to enter a weight age at the impact level in addition to the dimension level? Kindly help us understand.
rupali_ray
Employee
Employee
0 Kudos
Yes, In my example, I have put weightage only at dimension level. However, in the step 1 of "Create a Risk and Criticality Template" you can select the second flag. Based on that you can put weightage at the impact level too. For example, if orangization wants to put "HumanLife" as a priority then they can maintain impact "HumanLife" as 70% and "Environmental" as 30%. The risk score will also be calculated based on the percentage.
bewsherp101
Discoverer
0 Kudos
Hi

Maybe I have totally miss-understood something?

I don't understand what would trigger anyone to carry out this criticality analysis process - are engineers expected just to remember to do it?

1)is it in anyway integrated with the commissioning of the equipment - equipment status controls?

2)does the result on the analysis integrate back to the relevant equipment in any way (automatically) - add criticality score to classification possibly?

3)If equipment criticality is effected by a modification of the asset - is there any re-assessment process - or is there any integration into the equipment maintenance plans etc?

Please let me understand on a day to day basis how it could be used and kept accurate / useful.
rupali_ray
Employee
Employee
0 Kudos
Pending highlight card are available to ensure/remind incase an expected assessment is not done. Additionally upcoming assessment card might also be helpful, it is not currently available.

Currently, it updates only the ABC indicator. The criticality value is not added to classification

For risk and criticality, any changes in the equipment doesnt trigger a reassessment automatically. Reassessment option is available in the risk and criticality assessmnet and it needs to be triggered manually. For FMEA, if a new FM is added to the equipment, system prompts for a new FMEA assessment.
BWA
Explorer
0 Kudos
I have set-up the global indicators in a separate indicator group which is assigned to the equipment model and available in my equipment. After i publish my R&C assessment all indicators are updated except the criticality indicator. In your example i noted that the threshold is not adjusted. Do i have to make any setting to get the critically indicator updated and if so where?
rupali_ray
Employee
Employee
0 Kudos
Criticality indicator should be of type string. I didnt follow the part of "threshold is not adjusted". I would suggest to create a ticket if you feel the application is not working correctly. The issue can be addressed appropriately.
former_member688897
Participant
0 Kudos
There is an option to enable Financial Risk in the Risk Template. When we assign dimensions(like probability and Severity(which has a Financial impact) On Edit the Assign  Financial Risk option appears in a disabled mode?
rupali_ray
Employee
Employee
0 Kudos
you need to select (radiobutton) a dimension in the table, to get it enabled. Incase you did it, please create a ticket.
former_member688897
Participant
0 Kudos
Thanks. Another query on the financial risk- currently it seems that it is a manual entry field only. Is there any way or an enhancement possible to calculate the value dynamically ?
former_member688897
Participant
0 Kudos
can we have a risk matrix which can have probability mentioned in exponential values  and calculate overall risk score/matrix in decimals to whole numbers
former_member688897
Participant
0 Kudos
Also can we change the colors of thresholds while defining the assessment template?
rupali_ray
Employee
Employee
0 Kudos
No, from application side, it is not possible. However you can use API to calculate and update the field.
rupali_ray
Employee
Employee
0 Kudos
Not clear on the ask. No restriction on scale value which is maintained in scale object, you can maintain any number.
rupali_ray
Employee
Employee
0 Kudos
Not currently, however it is understood as an ask for more flexibility. This might get addressed later.
former_member688897
Participant
0 Kudos
Thanks. if we have large number of scales say 50 and we have 3 impacts, each scale representing unique severity and probability and in the template thresholds we define the limits equally which are represented with different colors e.g 1-1000000 is green, 1000000-2000000 is amber and so on till 5 thresholds. When we do the actual assessment, the matrix is displayed only in two colors , ie green and Red. Does this mean we should restrict the scales to max 5-10?
rupali_ray
Employee
Employee
0 Kudos
The usecase is not clear. Please create a ticket if you require any support.
kiranshankar369
Explorer
0 Kudos
Hello Rupali,

Thank for detailed information on ASPM.

I have query in this blog. In this Blog series of ASPM you have mentioned below words:

"Also, the same information is updated in ABC indicator if SAP ERP system is connected to ASPM and the equipment is sync with SAP ERP."

With my understanding, once the R&C assessment is published, system will update the "Threshold - Criticality" value (in the example you have show in you blog it is 'High") will be updated to ABC indicator of respective Equipment in SAP EAM if the sync is enables. Hope my understanding is correct here?

Also, i tried the same example where our SAP EAM & ASPM are synched. But when i published the R&C assessment the 'Threshold Criticality value" has not transferred back to SAP EAM from ASPM. Any reason why?

Looking forward to get some light on my queries.

Regards,

Kiran
rupali_ray
Employee
Employee
0 Kudos
Yes, your understanding is correct. Threshold-Criticality will update ABC indicator in EAM.

Since the RC is published and equipment was also synced to ASPM, it should update the value. Kindly create a ticket and team will analysis the issue.
cvizcaino
Explorer
0 Kudos

Hello Rupali, we are facing the same issue with ABC indicator.... in ERP ABC indicator field is not updated when Risk & Criticality results. Where should we look or check? Is there something that should be activated and we should check? Regards!!

 

Also we can see that any adjustments executed in ASPM is synchronized in ERP. Could you tell us if there is something that we might be missing? We followed every guide.

Regards! 

rupali_ray
Employee
Employee
0 Kudos
Hi Carolina, Is the syclo configuration of mapping the EAM ABC values to risk and criticality value done? https://help.sap.com/docs/SAP_ASSET_INTELLIGENCE_NETWORK/f90a444330144d5db63d345e298b5cff/4372bae946...

If the configuration is also done, please create a ticket for the team to check the issue.

Thanks & Regards,

Rupali Ray
cvizcaino
Explorer
0 Kudos
Hello Rupali....thanks a lot for your response. Yes, we followed the guide you mentioned but is not working. We have already created a ticket to SAP. so I will let you know as soon as we have any updates.

Regards!