on 03-29-2011 6:09 PM
Hi,
We are planning to split Our BI Dual stack system.
1) To perform ABAP system copy through Oracle tools.
2) To perform Java system copy through Sapinst and them import in to the system copy performed in step 1.
Could some one help me out, can we go ahead or not.
Thank you