3 weeks ago
Hi Everyone,
- Main TR to be released from Dev system
- Main TR to be imported into respective QA system (using automatic transport import job with frequency of 15 mins)
- Main TR to come to Production import queue
- Main TR to be imported into Production system (manually by schedule import job for Transport Request)
- Normal Change Document status to be moved to next "Imported into Production" automatically once TR import is successful (not working)
but in my case, this is not working
Anyone knows how to configure this
Hello,
Kindly check and verify the below points with respect to Import feedback in general along with the configuration needed for automatic status change :
If you have checked all these points and the issue persists, kindly create a case and direct it to the component SV-SMG-CM for further checks.
Best Regards,
Deepa
SAP Product Support
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
You can follow SAP Note 2635017 to achieve automated status change after transports are imported to production.
The background job SM:AI_CRM_CM_COM_IMPORT_FEEDBACK, the technical user SM_CHM, its authorization and SOL_CONNECT entry in BCOS_CUST on production are key elements.
Thanks.
Best regards,
Kashyap Shah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
78 | |
9 | |
8 | |
7 | |
6 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.