BjornHarzer
Participant
Member since ‎07-09-2014

User Statistics

  • 45 Posts
  • 5 Solutions
  • 77 Kudos given
  • 12 Kudos received

User Activity

Hi i have the requirement to email SD-BIL invoices, if the business partner has an e-mail address. If not the fall back should be printed otherwise. This is something which can easily be resolved in classic outputs with communication strategies...
Hi I am coming across a problem where I can't make out the best way of resolving it. I have an assembly material A which is configurable. This product A is typically sold on the back of a firm sales order using make-to-order with configuration...
Hi I setup the PO output management using the new tx BRF+/OPD process. I am now trying to make sure that the PO output is also stored in the archivelink. In the "old" world using tx NACE you just set up the condition record as "print and archi...
Hi gurus I have setup finite scheduling and automatic dispatch once a production order is created, there is no need for manual dispatch using CM25 et al. But what i got is this. I got an routing operation with "requires splitting = yes" and "max ...
Hi I have a configurable material which has a characteristic based on VBAP-MATNR for class type 300 (configuration). I use that dummy characteristic in Variant tables and constraints in tx PMEVC... I have also set the relevant characteristics ...