I have a master recipe: I have an operation with 2 phases (011&012) and secondary resources are assigned to both phases. However, the confirmation is currently only on the phases and not on the secondary resources. “If I understand it correctly...
So I have 2 tables, of which table 2 is a subset of table 1. Table 1 is a Change table and I want to change those values of table 1 which are included in table 2. My naive assumption was: <code>LOOP AT ET_OPT_RESULT_TAB ASSIGNING FIELD-SYM...
I have only the APO available without access to the ECC - in use is the variant configuration and I would like to read the characteristics of the sales orders - do you know what possibilities I have? found this I dont have the access to this fm ...
Hi there, Is there any way to add custom buttons/ functions to a SALV via BADI? I was able to find documentation for an ALV via. BADI ALV_GRID_XT - only to find out that what I want to extend is an SALV and therefore it doesn't work? Situation...
Hi folks, I read in the online help that in S/4HANA you can define plants as distribution centers. I have now searched longer in customizing and found no option. The docu still says that the plants which have the "flag" are then cifed to PP/DS wit...