Hi All, Client has created a customized planning calendar(T-code MD25) within an ECC system and linked it to the material master for utilization as an Inbound Calendar. only factory calendars have been successfully integrated into IBP through commu...
Hi All, I wanted to extract "Procurement Plant - RESWK" field from table EORD, This field is always empty when i use ABAP transform in CI DS data flow , however, works perfectly in normal transform for same Product/Plant combination. Unfortunatel...
Hi All, Planners want to override Demand Keyfigure dynamically either through Qty or percentage. their selection would be dynamic and choose to override either of keyfigure month by month. When planner input Override Qty 110, percentage keyfigure...
Hi, what are the integration options available to connect S4 HANA with Kinaxis/O9? ( or any other non SAP planning system). any one integrated S4 HANA (Add-On tables for SAP IBP) with Kinaxis/O9? Regards, Manikandan Shanmugam
Hi All, User have an access to edit Product master data (all master data) however getting an error while opening PLM app in IBP. (default planning area has been setup for user) Without default PA, could create PLM profile but once i close app, i...