Hello Experts!
We use QE71 for RR and UD for calibration. In the dynamic selection when I choose the option to filter it through equipment number, it outputs all the inspection lots which has different equipment number associated in the order.
Ca...
Hello Experts,
We created a K (cost center) PO and the material has QM active. After GR, an inspection lot was created. We cancelled the material document, but it didn't cancel the lot. It is still in REL, CAL status.
I tried canceling the lot t...
Hello Experts!
We have an MTO scenario. Sales order comes in which drives the demand to component level.
Sales -> MRP-> Planned Order-> Process Order.
When the process order is created, under the goods receipt tab, the goods receipt...
Hello Experts!
We have a requirement to display the SLED in MM/DD/YYYY format. We need to use the period indicator M in the plant data storage view of the material master.
When we use this is indicator, the SLED date changes to MM/YYYY form...
Hello Experts,
MRP runs in the background with MDBT variant with parameters 1 3 1 1 1. For the components, there is scheduling agreement and source list with correct validity dates.
After the background job it creates Purchase requisitions even t...
Thank you for your inputs. This issue was resolved by implementation of notes. I referred couple of notes as below.2138259 Material document cancelation does not reduce
inspection lot2186161 Goods movement cancellation does not cancel
inspection lot
Craig, Thank you! I appreciate your help. I am still testing and researching the SAP notesSomehow, the actual inspection lot quantity is not getting reduced for cost center (K) relevant PO . It don't even matter if I club it or not, it just won't red...
Experts - There seems to be something off for sure...If the inspection lot is not relevant to stock posting (Inventory), can I cancel the lot through reversing the material document?If I don't club the GR items in one inspection lot, then I still hav...
Craig the inspection lot origin is 01.Two line items in material document was clubbed into one inspection lot. Yes, I did cancel all the items in material document through MBST.Document data show the right PO and line item and the material document s...
Craig,I have been pushing it back with logical alternatives since couple of years. However, its a highly customized environment with lot of Z programs where the SLED conditions which would have to be met for the product to be shipped/
I don't see a...