former_member567077
Explorer
Member since ‎10-10-2016

User Statistics

  • 15 Posts
  • 0 Solutions
  • 9 Kudos given
  • 14 Kudos received

User Activity

Introduction This blog post provides insights about MRP Areas concept in SAP S/4 HANA 1809, there have been many conversations about MRP Areas being the new way for Planning. It also provides you detailed information about Planning at MRP Area level ...
Hi All, We have a production order with finished material ABC and component XYZ, where both the material are serial and batch managed. We are using control cycle for the component to be picked and moved to PSA location, so on release of productio...
Hi All, As we define MRP area for Subcontractor, if we have multiple subcon vendors we will have to create multiple MRP areas and assign each of them in material master and everytime we have a new Subcon vendor we need to configure a new MRP area. ...
Hi All, Want to see the stocks at storage location level in MD04, currently in ECC it is working by making the storage location not relevant to mrp we can see the split in stock wherein it doesnt consider the stock of different locations in MRP whi...
Hi All, Is there a way to create a one to one relation between Planned Order and Sales order without using MTO strategy 20? Right now we are using planning with final assembly strategy 40 and if there are multiple sales orders, after MRP ...