Hello, Experts.
I am using road scenario and trying to manually plan the FO with 2 stages A-B and B-C. The FU has Time window, for example:
(Dates are in DD/MM/YYYY HH:MM format)
A-B 01/04/2022 12:00 - 03/04/2022 12:00
B-C 03/04/2022 12:00 - ...
Hello, Experts.
I am trying to create the road FO with 2 FU (2 FWO):
1) Location A - Location C
2) Location B - Location C
Both FUs have the same departure and arrival time (for example 10:00 - 19:00)
The FO is created but with AB + BC stag...
Hello, experts.
I am trying to calculate charges of every stage in FO per hour.
For example, rate table with 50$ per hour
FO: 1st stage, 2 hours, 2*50 = 100$
2nd stage, 5 hours, 5*50 = 250$
Thanks,
Georgiy
Hello, experts.
I am using road scenario and I need some tool to combine the exact truck with exact trailer for VSR Optimizer run. Like standard driver for resource. Is it possible? Without creating a separate MTr for each resource.
Regards,
Ge...
Hi, experts.
I am using road forwarding orders with automativ freight unit creation. The business is so that products are being transported by the limited flow of demand. For example,
Forwarding order with 10 FUs each 1 ton.
Dates of FwO are 2...
Hi Michael,
Am I right, that I need to set up in active resource1 in tab "Combination resource" the combination of active resource2 and passive resource3? Why so?
Regards,
Georgiy