Hi Experts I have configure the material for both inhouse production and subcontracting. procurement type X and special procurement type as 30. Lot size EX, Strategy I have tested with both 10 and 40. I run MRP after giving PIR using MD61, no plann...
Hi Gurus MD04 show old subcontracting PO and against that there was partial good receipt. like order 50000 and GR was 10000. As user want to delete these old PO but due to incomplete GR, the PO is open. if after setting deletion indicator and deliv...
HI Experts availability check is set to KP i.e. no check but still system is considering available stock. I have made change in OPJJ as shown below but still system is considering previous planned order, production order, delivery etc. User ha...
Component is available as shown in fig When I try to create production order its FG and check for material availability for component then it shows zero stock of the component as in fig I have checked with changing with other storage locati...
Hi Experts BDC program is made to create production order of FG and SFG. FG and SFG have different group counter number as we are using reference operation set. If we execute BDC program for 5 FG and 3 SFG, every time it ask for group for ref opera...