Hi All,
I have below requirement,
Crate HU
Crates HU are created to pack the finished materials quantities. A Crate can have multiple material codes and quantities.
Crate is created with pre-defined allowed material wise quantities to pack.
...
Hi All,
I'm facing an issue in activity recalculation to the yield +scrap entered in the order confirmation screen (CO11N). Activities have been recalculated incorrectly for some order confirmations causing huge variances
Below is an example, her...
Hi All,
I have a question on deactivating the requirement without reducing the unconsumed PIR in the MD74
I tried searching the community but couldn't find an answer for this yet.
Problem is as below
2 requirement plans maintained
Plan - Z...
Hi All,
I'm getting a keyword "yesterday" when the derived at the order confirmation (during the night shift, when the system time falls in to shift time)
Can anyone explain the logic behind this and how to hide this ?
Product version is SAP S/...
Hi All
For production order without material , is there a way to block order release when there is no profit center is maintained in the order.
It is allowing to release the order with the below message.
Appreciate your input.
Thanks
Hi,You can refer SAP Best practices solution scenarios using SAP Signavio Process Navigator.Refer the below blog on SAP Signavio Process Navigator.https://community.sap.com/t5/technology-blogs-by-sap/sap-signavio-process-navigator-in-action/ba-p/1357...
Hi,Material specification is fixed for the material at client level where the material can have plant specific multiple inspection plans. Have you tried using both inspection with mat spec and task list for a relevant inspection type? (via the inspe...
Hi,Confirmation with errors arise when confirmed through BAPI if it is not handled explicitly.To reproduce this error, it you will have to confirm the order through Z* report (where the BAPI is used) while locking the order through CO02, for an exam...
Hi, You can have up to 6 parameters assigned formulas in a work center based on the standard value key you have defined in the customizing. Work center assigned routing can have those 6 parameter values. You can refer the below for more on standard v...
Hi,Standard setup time parameter and formula doesn't consider the variables like operation qtyTry creating a custom parameter for "variable setup time" based on the requirement (OP17)Then custom formula for "variable setup time. For an example, setup...