Hello Experts,
We are in a brown field implementation and IBP is connected to ECC currently.
Going forward, IBP will be connected to S4 and need your inputs related to below IBP extractors.
Will there be any technical change in these extractors...
Hello All,
We are looking for standard best practices to manage reserve/retain samples in SAP.
We have already considered some options like Physical sample, Manage reserve samples via a separate reserve storage location, Separate storage Bin at W...
Hello Experts,
One of my Customer is using ECN functionality and would like to enhance the change control process with QA approval from business point of view.
Customer is looking for below solutions to :
Change/Update the BOM quantity with CS0...
Hello Experts,
We are looking to set default Status - 4 and usage - 1 in the master recipe for a plant.
I have tried few options but unable to solve this query as ultimately it is calling to do some enhancement or use of transaction variant.
I ...
Hello Experts,
I am looking for options available in standard SAP where we can transfer the Accepted characteristic value of a Summarized MIC to the next required MIC to do calculations
Example:
MIC 1 needs to be sampled twice, While testing it...
Hello Kiran,In standard , there is no such validation existing in system where system will restrict the posting 04 inspection lot based on the rejection of 03 inspection type.Regards,Amit
Hello Kiran, This is as per standard design of 03 Inspection type. Please refer below link for your reference https://community.sap.com/t5/enterprise-resource-planning-q-a/standard-behaviour-of-inspection-type-03/qaq-p/5019594
Hello Kiran, This is as per standard design of 03 Inspection type. Please refer below link for your reference https://community.sap.com/t5/enterprise-resource-planning-q-a/standard-behaviour-of-inspection-type-03/qaq-p/5019594https://community.sap.co...