Hi,
I have created STO PO for 100 KL of product, from plant A to plant B.
Plant B has done Receipt of 98 KL through O4H1, in background loss of 2 KL was posted in SAP with movement type 851.
Now, when I run MB5T, it is showing this 2KL as in-tr...
Hi Neeraj ji,thank you for your inputs.But I have one doubt, if I do O4H1 in SAP upon receipt, should this not process 557 movement along with 851 movement and remove the stocks from plant.Or should I run 557 movement separately and remove the stocks...