S/4HANA 1809 was recently announced and there are several improvements and new featured introduced in different areas. The release highlights talk about new featured for Demand Driven MRP, Co-Pilot and many new features of the intelligent ERP.

There is a minor and under-noticed feature, however, which will make a huge difference in the daily life of the MRP Controllers who need to deal with multiple MRP Areas.

Since the first S/4HANA release, SAP introduced simplifications in the subcontracting process and in the storage location planning. Old scenarios where a special stock segment for subcontracting or for a storage location planned separately were no longer supported and they should be replaced by subcontracting MRP areas and storage location MRP areas, respectively.

While working with MRP areas brings lots of benefits (as I mentioned in my previous blog 5 reasons to use subcontracting MRP areas in S/4HANA.), there was one negative effect of using MRP areas: while the old features allowed all the subcontracting and storage location stock segments to be visualized in the same screen in transaction MD04, each MRP area had to be opened separately.

In some situations, the same material may have different subcontracting suppliers or different storage locations planned separately and using MRP areas in those cases would not make the life of the MRP controller easier.

After hearing the feedback of different customers who migrated to S/4HANA, SAP implemented a new feature that will improve the visualization of the Stock/Requirements List for MRP Controllers planning multiple MRP Areas.

As of S/4HANA 1809, the new Intra-Plant view was introduced in the Stock/Requirements List (transaction MD04), allowing the MRP Controller to have a complete overview of the Stock/Requirements situation, visualizing the multiple MRP areas for a material in the same screen.

In the new Intra-Plant View, there is a new set of buttons that will allow the MRP Controller to choose the best way to visualize the multiple MRP areas and quickly switch between different views. The figure below shows multiple storage location MRP areas assigned to the same material with a look and feel very similar to the old storage location planned separately.



This innovation is also not only available it the SAP GUI, but also when using the Stock/Requirement List in the Fiori Launchpad.



Another possibility is to have a non-aggregated available quantity, so that we can tell exactly how much do we have under each MRP area, but show all the MRP elements aggregated.



We can also completely switch off the aggregation and see the plant and the MRP areas together, as if there is no separation between them.



Each user can choose the best option to work and quickly switch between different visualization modes, or can define the preferred visualization in the user settings, by going to the menu Settings and choosing the option User Settings. Here, it is also possible to define if the grouping tab will be displayed or not.



It is important to reinforce that those options will be only relevant for displaying the MRP results in the Stock/Requirements List, but they will not be relevant for planning and each MRP area will be planned independently by MRP.

At last, this new feature should be activated in customizing, under the following path:

SPRO: Production - Material Requirements Planning - Evaluation - Display Material Groupings

24 Comments
Prasath
Contributor
0 Kudos
Hi Caetano,

Very useful documents to being latest update in S/4 HANA.

Prasath E

 
Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos
Thank you for the feedback Prasath!
vijay_rajarammundke
Participant
0 Kudos
Dear Caetana,

Thanks for such an informative information. Thanks for sharing.

Regards,

Vijay Mundke
ilachaudhary297
Participant
0 Kudos
Hi Caetano,

Nicely explained. very useful.

Thanks.

 
Mrinal_K_Roy
Active Contributor
Good blog as usual from you Caetano !!
UmeshMali4994
Active Contributor
Thanks for sharing..

Regards
Umesh Mali
Nice info Caetano! Thanks for sharing!
ibrahemy
Active Participant
very useful info. Thanks for sharing!
0 Kudos
Hi Caetano,

 

Very helpful document.

 

I am not able to view the Intra-Plant tab in MD04 after maintaining the settings suggested by you, can you please guide.

 



 

Thanks,

Pruthvee
Caetano
Product and Topic Expert
Product and Topic Expert
It should appear if you have multiple MRP areas for a material and planning elements on these MRP areas.
0 Kudos
Thanks
0 Kudos
Hi Caetano,

As we define MRP area for Subcontractor, if we have multiple subcon vendors we will have to create multiple MRP areas.

Can you please help me understand if there is any way possible to create 1 MRP area for multiple vendors and see the biffurcation in MBLB or any other way to track the stock at vendor location.

 

Thanks,

Pruthvee
Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos
Hi Pruthvee

Your question is not exactly related to the topic of this blog, so please open a separated question under the same tag.

Regards,
Caetano
0 Kudos
Sure will do that.

Thanks Caetano
csaba_timar
Explorer
0 Kudos
Any note number for this new functionality ?
Arulmurugan
Participant
0 Kudos
Hi Caetano,

 

Very nicely articulated across the table to keep ourselves to market relevant with latest release. Congrats and thanks.
Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos
Hello

This feature comes in S/4HANA 1809. Unfortunately, there is no note to implement it in earlier releases.

Regards,
Caetano
muralikrishnanpv
Explorer
0 Kudos

Hi caetano.almeida

Thanks for the blog.

We have enabled the Intra-Plant view and there is an observation from the users that the exception column doesn’t get filled while switching tab from Individual list.

Is this an expected behavior?

Thanks,

Muralikrishnan

i520
Advisor
Advisor
0 Kudos
Excellent Document, Thanks caetano.almeida for the valuable blog !
steffen1893
Member
Dear Caetano,

thank you for this very helpful documentation.

Our users ask to move the intra plant view forward and change it with the individual list.

Most of them has more than one MRP area to monitor and do not want to switch each time from individual list ot intra plant view. Is there a user parameter which we can set or an existing user exit were we can maintain some own coding?

 

Thanks

Steffen
Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos
Hi Steffen

As far as I know, there is no standard way to change the sequence of tabs in MD04, but I'll bring this suggestion to our product management team.

Regards,
Caetano
0 Kudos
Hi Caetano

 

Thanks for the blog. Is there more technical information available for this one? For example, are there any BADIs/User Exits? We would like to implement some logic to filter out some of the values in the list.
tom_kaeser
Participant
Hi caetano.almeida ,

we have the same requirement from business.

Is it possible to set the intra-plant view as default for MD04?

That the user does not need to switch every time opening the MD04 from Individual List to Intra-Plant View?

If not - should I open an improvement request?

BR

Tom
matthias_stolz
Explorer
Hi Catenao,

Thank you for this concise blog. Is there any update from the developer team on whether the intra-plant view can be shown first as a default setting?

Thank you!

Best,
Matthias