on 03-05-2015 3:58 PM
Hi,
We have a very peculiar issue we are trying to resolve. Consider this situation:
- Purchase Unit of Measure (PUoM) = CS = 3 EA
- Base unit of measure = EA
- Purchase unit of measure is set to Active
When I create a PR for 1 EA (via a sales order), the source of supply is determined and the order unit is set to CS (as per above). When I create the PO for this PR, it is created for 0.333 CS. But my unit of measure CS does not accept decimal places.
I need to find a way to overwrite the order unit of the PR to be EA instead of CS (since the PUoM is set to Active). The vendor accepts that we purchase in EA instead of CS sometimes.
Any ideas how I can do this ? Which user exit/enhancemnt spot/BADI can be used with the old PR transactions (ME51) instead of the Enjoy transactions (ME51N) ?
Thanks,
Sevin
Hello,
As you mentioned In material Master maintain Alternate unit of measure like
1EA,------1EA
1CS--------3EA
As per std sap Valuation Price and Base unit of measure copied from Material master , I mean
the PR is always in the base unit of measure, you cannot change this.but in item detail source tab you can enter a desired order unit
SAP Note 493318 - FAQ: Purchase requisition (ME51N,ME52N, ME53N) Q&A.20
Thanks
mahesh naik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.