Motivation:


• In automotive, packaging of finished goods according to customer requirements is very common
• Customer specific packaging was not possible in standard
• Protection of HUs against changes was missing

Scope
Creation of plan HUs using the Unified Package Builder (UPB)
• Synchronous GR posting of HUs including UPB information and sales
document reference
• Status management for HUs to prohibit changes
• Usage of UPB information in outbound deliveries to be used for picking
• Picking of HUs according to customer requirements
• New indicator in SD scheduling to activate the new process

Concept:

Customer-defined packing and picking is a streamlined, end-to-end process for handling units (HUs) that are created with a reference to a sales scheduling agreement and according to a packing instruction (PI) or packaging specification (PS).



In this process, products are packed in production( Manufacturing Discrete or Repetitive) according to customer-specific criteria. The resulting HUs can't be modified and are stored in the warehouse before they are shipped to the customers. Before goods issue, the system ensures that only those HUs are picked that were packed according to the referenced sales scheduling agreement, packing instruction, or packaging specification.


The scenario is replicated using discrete manufacturing. In a discrete manufacturing environment when a predefined quantity of a finished product is completely produced into a pre-planned HU against a scheduling agreement, the production worker wants to post the goods receipt of the HU in the system. The HU carries the reference to the used packing instruction and the scheduling agreement.

Later on, after the HUs are putaway into the warehouse, HUs with the same packing instruction and for the same scheduling agreement shall be determined for outbound deliveries. Important is that only those HUs shall be picked which were produced using the packing instruction and were planned and produced for exactly this scheduling agreement.

Master Data:

Packing instruction of Finished Goods. POP1

Determination of packing instruction: POF1

Replication Steps:

GR of preplanned HUs for production order using packing instruction and scheduling agreement to an EWM managed storage location. GR and putaway of the HUs. Outbound delivery creation against the scheduling agreement. Picking of HUs using packing instruction and scheduling agreement. GI posting of HUs.

  • Create Production Order- CO01



 

  • Create Scheduling agreement VA31. PI/PS based HU picking.


In an item, on the Shipping tab, apply the picking criteria for handling units (HU) so that the system picks according to the sales scheduling agreement and packing instructions or packing specifications (PI/PS). Below example is used wit PI.




  • Create plan HU with reference of Scheduling Agreement-COP12



 

Save the HU:


 

  • Post GR of HU in discrete manufacturing-COWBHUWE 





  • Check the Production Order and navigate to material document- CO03



 


 

UPB engine is updated.


 

  • HU identification type is having Sales Document reference-The HU carries the reference to the used packing instruction and the scheduling agreement.



 

  • /SCWM/MON - Warehouse Monitor Node -> Documents -> Warehouse Tasks


/SCWM/TO_CONF


 

  • Create outbound delivery for your scheduling agreement-VL10E


An outbound delivery is created for your schedule agreement. This LE Outbound delivery is directly distributed to the EWM.


 

  • Check ODO in /SCWM/MON


ODO captures the stamp of picking as per Sales Document reference.


The reference of sales document SO is tied to item, which implies item HU has to picked as per SO reference only.


 

  • Create Warehouse Task- Perform Picking as Per Sales Scheduling Agreement.



 

  • Warehouse task will only be created for HU which has SO reference.

  • .


Confirm Warehouse- /SCWM/MON


 

Post Goods Issue- /SCWM/PRDO


 

Check S/4 Delivery- VL03N


Configuration:

Unified package builder Set up.




  • Assignment of UPB to Document type



Thanks for reading the blog. All the content, screen shots and process have been written on my own personal insight and have been performed in S/4 HANA 2022 Embedded EWM.