cancel
Showing results for 
Search instead for 
Did you mean: 

Severe error(s) occurred in phase MAIN_PROFSTART/STOPSAP_TRANS!

Former Member
0 Kudos

Hello All,

I am during downtime of upgrader CRM production system. At start of downtime I get this error:

We have to pplication server. 

This trouble ticket was created by SAPup on 20141220035316
-------------------------------------------------------------
SAPup broke during phase STOPSAP_TRANS in module MAIN_PROFSTART / Downtime I: Set up system for downtime
Error Message: RFC login to system PC1 ashost dkrdssap217 nr 02 gwhost dkrdssap217 gwservice sapgw02 failed with code 1 key RFC_COMMUNICATION_FAILURE:
LOCATION    CPIC (TCP/IP) on local host with Unicode
ERROR       partner '10.0.26.252:3302' not reached
TIME        Sat Dec 20 03:53:16 2014
RELEASE     721
COMPONENT   NI (network interface)
VERSION     40
RC          -10
MODULE      nixxi.cpp
LINE        3283
DETAIL      NiPConnect2: 10.0.26.252:3302
SYSTEM CALL connect
ERRNO       10061
ERRNO TEXT  WSAECONNREFUSED: Connection refused
COUNTER     25

Thanks for any help

Reza

View Entire Topic
former_member182657
Active Contributor
0 Kudos

Hi Reza,

As you're still not under downtime,and SUM fails to connect the system for clean stop then you could stop SUM and repeat the phase by starting all.

Regards,

Former Member
0 Kudos

Hello Gaurav and Abhishek,

I did stop sum and sap restart the windows and restart Again sap and sum, but still the same

Thanks

Reza

0 Kudos

Hi Reza,

Can you share the following logs and output?

1. Latest SUM directory logs

2. Output of command "sapcontrol -nr <inst no> -function GetProcessList"

3. Output of command "ps -ef | grep sap"

Regards,

Abhishek

Sriram2009
Active Contributor
0 Kudos