former_member190992
Participant
Member since ‎04-02-2014

User Statistics

  • 56 Posts
  • 1 Solutions
  • 0 Kudos given
  • 0 Kudos received

User Activity

Hello All, I am facing a problem of How to manage subcontracted production operation without stock transfert to subcontractor, in fact, for our system, we do cutting subcontracting but cutted pieces are not defined as semi finished goods (we hav...
hello colleagues, can someone explain to me why the systeme generates two confirmation references for the same confirmation throught COR6N. thanks a lot. Alaaeddine.
hello colleagues,I am facing a strange problem with MMCL Tcode.when I try to display the batch stock through MMCL, a dump is generated.after debugging, I found that the root cause is due to the material deviation in the batch master data.with many te...
hello colleagues,I'am new with contract pricing, thus I have some question related to that, based on the below screen shot:-what is the difference between blue lines and black lines?-how is the current condition is defined?- when deleting an item fro...
hello colleagues,can someone advise how to set up unloading point on scheduling agreements automatically, I mean without manual inputs.thanks.Alaaeddine.