Hello guys,
For the product SAP EWM 9.5, the one which is not part of S4HANA, mainstream maintenance ends by 2025. Do you know what does that mean?
Clients need to switch ECC to S4HANA by 2025, does it mean they have to switch EWM based on S4HAN...
Hello everyone,
I have a requirement that i need to close process step for multiple HU at the same commit, so their next task are evaluated all together.
My plan is to close them in a single commit, so i can pick them up in filter/sort bins badi...
Hello everyone,
I have a problem with CW related opportunistic cross dock operation.
This is the process flow in general;
1. Receipt of material: An RF user creates HU's depending on inbound delivery and sets valuation measurement to 'A'(The m...
Hello all!I posted a goods movement by /SCWM/ADGI. This is a non-EWM storage location stock transfer process(from EWM to ERP).Then i try to cancel this movement again at /SCWM/ADGI. Goods movement is canceled, both in EWM and ERP; but reference docum...
Hello folks!I have a question for you. I assigned a pick-hu to a warehouse order, but now i want to delete it and assign to another WHO.When i try to delete this assignment at tcode: /SCWM/TO_CONF, i get error type message like "/SCWM/WHO508: Assign...
Hi Albrecht,
Thanks for the second part.
I would like to understand the roles of each application, especially on synchronization process you mentioned. Sometimes, robots (tend to) forget orders or it gets lost during transmission. In the architectu...
Hi Albrecht,
What is the role/benefit of using SAP Cloud Platform in between?
I feel like you couldn't solve something with SAP EWM and used SAP Cloud Platform, what is that?
Best Regards
Serhan
Hi Nic,Thanks for you answer, but still it's not clear to me. Roadmap doesn't say anything about EWM standalone's future, maybe I missed this, it was explained in the past publications.Actual roadmap only explains what's coming for EWM on S/4HANA. Th...
Dear all,Still no way to close multiple HU's in a single commit. But SAP introduced a fix to locking of HU's while creating LOSC for multiple HU's.2771616
- LB Erzeugung mit Lagerungssteuerung und geschachtelten HusWith this note, at least it's possi...