Hello,
We are on BPC version 10.1 and we are using a YTD application for consolidation. The system does not calculate January Periodic values correctly. (It basically substracts Jan YTD. value from Dec.YTD value of the previous year which obviously...
Can I use Measure for a dimension other than Account to get YTD data?
I am currently in SAP BPC 10.1 Standard making a report through the EPM plugin. I have the following situation and it is that in the current report it is displayed by a dimension...
Hi everyone,
I'am trying to do a script logic in SAP BPC 10.1 Standard with next parameters:
The target is for example, when the user select the month ABR.2021, I should have a package for the next;
EBITDA_MOVIL= VALUE EBITDA(DIC Previous ye...
Hello
My situation is the next; in sap bpc 10.1 standard
I was testing my copy package with a setup where I need to send the current month's data to the next month. I have tried it, but the value is copied to the following month and the current ...
Hi everyone,
I am on SAP BPC10.1 Standard. I am trying to configure a “Copy” data packet to look like this;
1. Data is delimited, that is, these parameters will always be fixed.
2. Data that can be selected by the user.
I was looking at an...