former_member14504
Explorer
Member since ‎02-21-2018

User Statistics

  • 41 Posts
  • 0 Solutions
  • 4 Kudos given
  • 3 Kudos received

User Activity

Hi guys, during the MPS run (MD40), system netified unneeded Planned Orders because the PIR requirements are already covered by firmed Planned Orders created before the MPS run. Please, have a look at the 2 scenario screens in MD04. md04-case-1...
Hi guys, have you also noticed that in S/4, in CA02/03 transaction, the graphic display of routing operation is not available? It was very useful in case of alternative or parallel sequences... I attach the screen of this function in ECC6 an...
Dear experts, I'm new on PP-PI module. System is S/4 1909.I was sure to find some standard "Process Instructions" preconfigured in SAP. When i tested a creation of one Master Receipe, I realised that no entries were available. So i checked in SPR...
Dear QM Experts,Scenario is the following: There is one Task List Group with 3 Group Counters (i.e. 3 different Inspection Plans for the same material under the same Task List Group). Each of these Inspection Plans has the same Usage (04 - Goods R...
Dear All, I am carrying out a series of tests on the inspection lot driven by the presence of Dynamic Rules. These are my settings: 1) Creation of Dynamic Rule with skip frequency 3. Then client wants to test the first Batch, skip the 2nd, 3...