Hi guys,
during the MPS run (MD40), system netified unneeded Planned Orders because the PIR requirements are already covered by firmed Planned Orders created before the MPS run.
Please, have a look at the 2 scenario screens in MD04.
md04-case-1...
Hi guys,
have you also noticed that in S/4, in CA02/03 transaction, the graphic display of routing operation is not available?
It was very useful in case of alternative or parallel sequences...
I attach the screen of this function in ECC6 an...
Dear experts,
I'm new on PP-PI module. System is S/4 1909.I was sure to find some standard "Process Instructions" preconfigured in SAP. When i tested a creation of one Master Receipe, I realised that no entries were available.
So i checked in SPR...
Dear QM Experts,Scenario is the following:
There is one Task List Group with 3 Group Counters (i.e. 3 different Inspection Plans for the same material under the same Task List Group). Each of these Inspection Plans has the same Usage (04 - Goods R...
Dear All,
I am carrying out a series of tests on the inspection lot driven by the presence of Dynamic Rules.
These are my settings:
1) Creation of Dynamic Rule with skip frequency 3. Then client wants to test the first Batch, skip the 2nd, 3...
Is there now any fancy way to brake down this string of control indicators? I tried to divide every element as a new row in excel, but this is different between quan and qual mics so I can't be sure it works. Its a long process to test it... I don't ...
Thank you Sourabh, so for automatic assignment some field within Inspection Plan's header must be taken as a condition, on which the logic will be created? Or there is any other way?
Dear all,I was able through O20C o20c-screen.jpg transaction to copy the standard customizing entries for the "Control Receipe Destination".
But when I try to copy Process Instructions I get this error :Message "0C002 - An internal error occured whil...