former_member184666
Active Contributor
Member since ‎10-22-2008

User Statistics

  • 1,228 Posts
  • 148 Solutions
  • 0 Kudos given
  • 316 Kudos received

User Activity

Dear All,I have gone through the SAP DRP help. Can somebody explain with one example about DRP, where it is useful and how to process DRP in SAP PP. Any config settings to be done, How to set up distributuon network and How Deployement to be executed...
Hi All,Subsequent to Payment Block discussion had in QM forum Block the payment if inspection lot is not cleared by quality i am facing the below issue.I activated QM Proc with control key 0007 (Invoice Block) for 01 inspection type material. As disp...
Dear All,I have requirement to block the payment if inspection lot (01 Inspection type) is not cleared by quality. Activated QM Proc active and maintained control key 0007 in material master QM view.I rejected the lot, able to generate the Invoice fo...
Overview on CBP:CBP consumption based planning use hostorical data to calculate the future requirements with the help of material forecast or static planning procedures. Net requirements calculation is not triggered by an independent or a dependent r...
This document gives some basic FAQ's on MRP and Availability Check.Does ATP (OPJJ) settings have any impact on MRP ?The settings in the scope of check apply only to the ATP check and have no effect on MD04 and planning. They have an effect only on th...