davide_delmonte
Participant
Member since ‎04-09-2014

User Statistics

  • 50 Posts
  • 5 Solutions
  • 5 Kudos given
  • 5 Kudos received

User Activity

Hi all, I've read a lot of topics about cross-company subcontracting, with a lot of workarounds... Is there a standard SAP solution to manage the scenario described below? I think this could be a common scenario, where a company provides an assembly ...
Hi, we have a scenario in wich we need a repair sales order (RA), for which we want to receive all the components of a product (exploding the sales BOM as returns in the "repair" tab of the item), and deliver the finished product repaired. Is there...
Hi experts, We're facing this requirement: We have 2 storage locations, ATP check in sales documents is executed by plant (no storage location on sales order item), because all the stocks are available for selling. At the moment of delivery, th...
Hi gurus. We have this requirement: 3 storage locations, all the storage location must be relevant for MRP run and planning. Only 2 of them must be relevant for ATP check during sales order creation/rescheduling. I've read other threads and r...
Hi gurus, I checked notes and other questions here, but I've found no solutions. In purchasing document STO we have ATP active and routes, the system determines schedule lines with correct Goods Issue date When we create the delivery from tr...