Hello together,
Im trying to update a data model in SAC via file upload. The model has a calculated column.
But when I upload the data I need to map a column also to the calculated column of the model which I cant do because it is a calculated co...
Hello together,
In my Analytics Application I want to filter Data in two charts.
These charts get their data from different models (both excel files). Because of that I want to link the models via "link dimension" like its possible in a normal SA...
My model looks like this:The Column "Sum" is a calculated column added the following way:It shows the total of "Wert1" and "Wert2". That works fine when I build the model.But when I want to update the model I cant update it because SAC want me to map...
Hi Venkat,my question is where do you get the current date from? Is it already in your model or are you able to get it from the system?Thanks in advanceMike
Thanks for your reply,I try to specify my problem a little bit more straight forward:I have two datasources ( lets call them Model 1 and Model 2) and a chart build on top of each Model. Now I want to link/ join the two Models with a key (number) whic...