radulani
Explorer
Member since ‎08-03-2020

User Statistics

  • 21 Posts
  • 0 Solutions
  • 5 Kudos given
  • 1 Kudos received

User Activity

Hello Experts, We have implemented SAP OEE along with SAP MII. We have the following scenario- Once the order is released and it is in MII, there is a chance that the supervisor wants to change the work center of a routing operation due to ...
Hi experts, We have implemented DMR at lot level for our inspection process. We will also be implementing a background job for the automatic UD of SKIP lots created. I know we can have multiple inspection plans for a material and the lot hence crea...
Hi experts, I have an inspection plan with 2 operations 10 and 20. Both my operations use QM01 as a control key. Do we have any inspection operation level confirmation feature available within QM space and if so, can someone please share more detai...
Hi experts, I have a inspection plan with 2 operations 10 and 20. Is it possible to maintain some configuration or a restriction whereby I cannot do results recording for operation 20 before I complete results recording for operation 10? Basically ...
Hi experts, Can someone please explain why the DMR assignment option in inspection plan header is disabled when we set the inspection usage 3 (universal)? We are working with a material with inspection type 89 assigned to it and we are creating a m...
Kudos from